SHARM-EL-SHEIKH EXPANSION PROGRAM

  • Next »
Title Sharm-el-Sheik International Airport Expansion Program, Egypt
Client Prointec for Egyptian Airports Company
Practice Area Planning; Engineering; Procurement Support Services.
Date  2009 – 2012

Description
The expansion programme at SSH International Airport involves major construction at both the airfield and the passenger terminal area and road access.

The airfield expansion includes the construction of a new 3.600m long ICAO code E runway, a new taxiway system, and a new apron designed for 15 remote stands and 25 contact stands around the new Terminal 3.

The new 200.00 sqm terminal building developed in two main operational levels is intended to serve 10 million passengers per annum, which will bring SSH total capacity to 17 MPax.  The project also comprises a new access and parking area, electrical distribution systems, airfield associated facilities and utilities, ancillary buildings, and aviation fuel hydrant systems.

The Enroute team has been involved in different work areas that extend over the planning, engineering and project implementation phases, including:

  • Master plan development
  • Airfield conceptual and detailed design
  • New access and urbanization conceptual and detailed design
  • Electrical distribution systems
  • Airfield associated facilities and utilities
  • Obstacle limitation surfaces study
  • New terminal building facilities and utilities
  • Airfield and terminal building design management and coordination
  • Development of method of measurement specifications and project budget using a CSI master format 2010 structure
  • Project controls during the planning, design and tender phases
  • Preparation of pre-qualification questionnaires for the airfield and terminal building tenders under african development bank rules
  • Supervision of the pre-qualification processes; evaluation of applications and preparation of contractors short-lists
  • Preparation of tender documents for the airfield and terminal building tenders, under african development bank rules.

Gallery
Enroute_Terminal_Building Enroute_Airfield_Design Enroute_Terminal_Building Enroute_Facilities_Design Enroute_Safety Enroute_Facilities_Design Enroute_Safety Enroute_Terminal_Building Enroute_Tocumen_Panama Enroute_Tocumen_Panama Enroute_Sharm_El_Sheikh Enroute_Procurement Enroute_Procurement Enroute_Master_Planning Enroute_Airfield_Design Enroute_Safety