Six work areas – Hard work areas
From initial airport planning and feasibility stages, to project implementation, and airport operations support, Enroute can help customers to realize their potential and make things happen in six different work areas. Six areas of hard work where Enroute will strive in pursuit of results by mastering on our state of the art engineering and simulation tools, previous international experience, and sound knowledge of International Civil Aviation standards.
Master Planning
- Airport Master Planning
- Siting Studies
- Capacity Analysis
- Terminal Building Functional Design
- Greenfield Airports Feasibility Studies
- Facilities Planning
- Airspace Analysis
- Navaids siting
- Environmental Planning
- Strategic Environmental Assessment
- Environmental Impact Assessment
- Airport Noise Analysis
- Airport Emissions Analysis
![Enroute_Master_Planning Enroute_Master_Planning](http://www.en-route.aero/wp-content/gallery/cache/47__250x150_planning.jpg)
![Enroute_Master_Planning Enroute_Master_Planning](http://www.en-route.aero/wp-content/gallery/cache/75__250x154_planning2.jpg)
Aviation & Airport Transactions
- Traffic Forecasting
- Airport Inventory
- Compliance Inspections
- Legislation & Regulation
- Development Plans
- CAPEX & OPEX plans
- Earnings Forecasting
- Financial Analysis
- Commercial Plans
![Enroute_Aviation_Airport_Transactions Enroute_Aviation_Airport_Transactions](http://www.en-route.aero/wp-content/gallery/cache/76__250x200_transaction.jpg)
Simulation & Modelling
- Airfield and Airspace Processes
- Terminal Building Processes
- Aircraft Turn and Swept Path Analysis
- Multilayer Pavement Modelling
- Navaids Signal Modelling
- Airport Noise Modelling
- Airport Emissions Modelling
![Enroute_Simulation_Modelling Enroute_Simulation_Modelling](http://www.en-route.aero/wp-content/gallery/cache/49__250x150_simulation.jpg)
Aviation Safety Management
- Aeronautical Studies
- GIS-based Airfield/Airspace Obstructions Analysis
- Safety & Risk Assessments
- Construction Operational Plans
- Minimization of Airport Operations Disruption during construction
- Analysis of flight procedures
![Enroute_Aviation_Safety_Management Enroute_Aviation_Safety_Management](http://www.en-route.aero/wp-content/gallery/cache/74__250x152_safety2.jpg)
Project Implementation Management
- Development Phasing
- Construction Schedules
- Design Management
- Project Controls
- Procurement support services
- Management of Procurement Process
![Enroute_Project_Implementation_Management Enroute_Project_Implementation_Management](http://www.en-route.aero/wp-content/gallery/cache/72__250x150_implementation2.jpg)
Airport Engineering
- Airfield Design
- Layout
- Pavements
- Earthwork, Drainage and Airside Treatment Plants
- Marking
- Visual & Navigation Aids
- Ancillary & Control Systems
- Airport Facilities Design
- Meteorological Facilities
- Power Plants and Distribution System
- Air Rescue & Fire Fighting Systems
- Hangars
- Building Facilities Conceptual Design
- MEP Systems
- Baggage Handling Systems
- HVAC Systems
- Fire Fighting and Fire Alarm Systems
- Building Management & IT Systems
- Conveying Systems
- Electronic Safety and Security Equipment
- Passengers Boarding Bridges
- Heliport Engineering
- Helipad & Heliport Siting Studies
- Helipad & Heliport Facility Planning
- Helipad & Heliport Design
![Enroute_Airport_Engineering Enroute_Airport_Engineering](http://www.en-route.aero/wp-content/gallery/cache/45__250x150_engineering.jpg)
![Enroute_Airport_Engineering Enroute_Airport_Engineering](http://www.en-route.aero/wp-content/gallery/cache/71__250x375_engineering2.jpg)